The Exo Building - The Point Village Dublin.
 
  •  Installation of 500t of temporary tower steelwork under the external façade framework.
  • Installation of 3000t of main building steelwork to each level.
  • Adjustment of the cantilevering trusses of the building by means of tensioning of the diagonal members. The operation, called “active alignment” eventually reduces the reaction on the temporary towers which can be fully de-propped and dismantled.
  • De-propping and dismantling of the temporary towers.