Client:

Bennett Construction

Value

€680,000

Duration:

9 Months

Start Date

June 2018

Description:

Demolition Works

 

Alterations & Structural Steel Package - €220,000

  • The alterations and structural steel package consisted of further demolition work to a protected building. Including the design and installation of a temporary propping system to retain the existing façade in order to partially remove the roof and timber floors. Followed by the supply and installation of new structural steel to the entire building.
  • The works also temporary works to cover forming a number of new structural openings throughout the building and the installation of permanent steel to these openings.

Enabling Works – €460,000

  • The enabling works package consisted of the demolition of existing city centre buildings, demolition of existing RC basement and backfilling with suitable fill material, demolition and strip out works within an existing protected building to be retained and temporary propping to several adjoining buildings. The works also involved the removal of Asbestos material prior to demolition works.